Location: Raleigh, NC
Completion Date: Winter 2009
Green Roof System: Xero Flor America
Size: 2,300 sqft
Plant Material: Sedum mat
Services Provided: Consultation, installation, and maintenance
LRI consulted on the design and installed the green roof on the entrance canopy for the new WakeMed Patient Tower. For the 2,300 square foot extensive green roof, a thin, lightweight, pre-vegetated system was chosen to keep additional structural loads to a minimum. The roof is highly visible from patient rooms and hallways.